Process mining methodology for digital processes under smart campus concept

dc.contributor.authorCengiz, Esra
dc.contributor.authorDoğan, Onur
dc.date.accessioned2023-03-22T19:48:06Z
dc.date.available2023-03-22T19:48:06Z
dc.date.issued2022
dc.departmentBelirleneceken_US
dc.description.abstractDigital transformation affects universities as well as many industries. Universities are increasingly using various digital resources and systems to manage their knowledge. The smart campus, on the other hand, supports informed decision-making by integrating these resources and systems. Process mining provides real insights for digital transformation, allowing processes to be examined more transparently. This study aims to examine the proposed project implementation processes related to the smart university with the process mining methodology. For this purpose, 32 completed projects submitted to İzmir Bakırçay University Scientific Research Projects Coordinatorship (BAPK) with the proposed methodology adapted from Deming's continuous improvement cycle were examined. The data are taken from two different pages in the project automation system. According to the research findings, Projects are grouped into three categories: Guided Projects (GDM, 5 projects), Graduate Thesis Projects (TEZ, 5 projects), and Career Start Support Projects (KBP, 22 projects). 40.6% (13 projects) of the applications went directly to the project review stage, while 19 (59.4%) needed procedural correction. Considering the time from the creation of the application of 32 projects to the signing of the contract, it is seen that the arithmetic average of the cycle time is 15.1 weeks, and the median average is 52.5 days. The notable difference between arithmetic and median mean is that very few projects are of long duration. Procedural adjustments affect project evaluation cycle time by an additional 14 days. The carelessness or lack of knowledge of the applicants extends the cycle time of the process from 15 days to 53 days. The total duration of unnecessary waiting time in the process is 17 days. This study primarily proposes that non-digital processes should be digitized as soon as possible.en_US
dc.identifier.doi10.35193/bseufbd.1162284
dc.identifier.endpage1018en_US
dc.identifier.issn2458-7575
dc.identifier.issue2en_US
dc.identifier.startpage1006en_US
dc.identifier.trdizinid1151677en_US
dc.identifier.urihttps://hdl.handle.net/20.500.14034/979
dc.identifier.urihttps://doi.org/10.35193/bseufbd.1162284
dc.identifier.urihttps://search.trdizin.gov.tr/yayin/detay/1151677
dc.identifier.volume9en_US
dc.indekslendigikaynakTR-Dizinen_US
dc.language.isoenen_US
dc.relation.journalBilecik Şeyh Edebali Üniversitesi Fen Bilimleri Dergisien_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.titleProcess mining methodology for digital processes under smart campus concepten_US
dc.typeArticleen_US

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
onur doğan.pdf
Boyut:
1.32 MB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam metin / Full text